LIVE INTERACTIVE DEMOLIVE DEMO— click any marker to explore · sample data

Production Overview

Every job, every due date — one live floor

LIVE INTERACTIVE DEMO

See your whole floor on one screen.

A 60-second walk through a live production system — every job, every due date, and the money the silent ball-drop is quietly costing you. Built for the shop floor, not for show.

Done-for-you · live in weeks · you own it outright

Sample data — nothing here is real. Exit anytime.

Production control · for UK manufacturers & job shops

First you hear a job slipped is when the customer calls.

One live view of every job on the floor — its stage, due date and cost — so nothing slips without you seeing it first. Built in weeks. Yours to own.

Field reports “Jobs due tomorrow are on the second page of the report; jobs due in six weeks are at the top.” public JobBOSS² review — 1 of 190+ operator reviews we mined

Live in weeks · works with your routing · you own it outright

Only 3 audit slots a week.

Section 02 · Where it leaks

Where jobs quietly slip.

Production pain rarely shouts — it's the slip you only spot when it's already late. Every one costs you a rush job, the overtime, and a customer who now checks up on you. Logged the way a foreman would, with what each one actually costs.

  1. 01

    No live job view

    Nobody can say what stage a job is at without walking the floor and asking.

    Idle machine
  2. 02

    Delays spotted late

    Material runs short when work stops — not when there's still time to reorder.

    Late jobs
  3. 03

    “Where's that order?”

    Status lives in someone's head, so the same question gets asked all day long.

    Wasted hours
  4. 04

    Schedule by whiteboard

    The board is only right if someone remembers to update it — and they don't.

    Missed ship
  5. 05

    Wrong job runs first

    The job due tomorrow waits while one due in six weeks goes on the machine.

    Overtime
  6. 06

    Reruns nobody logged

    Scrap and rework get redone quietly, so the real cost of a job is never known.

    Scrap
Section 03 · The cost of chasing

What's chasing job status costing your floor?

A rough estimate based on the hours your people lose walking the floor, asking "where's that job?" and rebuilding the schedule by hand. It doesn't even count the rush jobs, the overtime, the scrap or the lost customers.

Estimated cost of chasing, per year£27,648

Illustrative only — the Gap Analysis validates the real number on your floor.

Section 04 · Field reports

You're not imagining it.

The exact problems you just read — in the words of operators running the tools you've already priced. These are their public reviews of other software, not testimonials for OpsMavix.

The entire shop is run from my head.
Small manufacturerpublic review
Jobs due tomorrow are on the second page of the report; jobs due in six weeks are at the top.
VP OperationsJobBOSS² review · Capterra
We spent $100,000 on the software and now pay $38,000 a year for a system where we don't even use half the functions.
Industrial firm, 11–50 staffNetSuite · public 2★ review
Not nearly worth the 165,000 — and it isn't even written for our industry.
ManufacturerDynamics 365 BC · public 1★ review
Most data tracking was done in Excel, because Sage was too difficult to get a full picture.
Operations leadSage 300 · public forum thread
QBO is too small, NetSuite is too expensive. What's a middle ground?
Manufacturerpublic Reddit thread

Drawn from 190+ public reviews we mined across Capterra, G2, Trustpilot and Reddit. Quoted for the problem described — not an endorsement of OpsMavix.

Section 05 · There's a middle

You've priced the £100k ERP. You're still run by a whiteboard. There's a middle.

Six-figure systems and a year-long rollout on one side; whiteboards and spreadsheets that leave you blind on the other. We build the band in between — one production system shaped to your floor, live in weeks, that you own outright.

Whiteboard & spreadsheets Cheap, but blind no live status · re-keyed · breaks at scale
OpsMavix Live job tracking, built for your floor your routing · live in weeks · yours to own
£100k+ ERP Rigid & oversized year-long rollout · not built for your trade
Section 06 · A safer way

Don't rip out your floor. Prove one workflow first.

We de-risk the change by starting with one contained result on the floor — not a year-long rollout. You expand to the rest only after the first workflow has paid off.

  1. 01

    Find the job that slips most

    We walk the flow of jobs, materials, scheduling and dispatch and pin down the one workflow costing you the most rush jobs, overtime and late shipments.

  2. 02

    Build and test it against real jobs

    We map how your floor actually runs, agree what success looks like, connect your routing and job data, and prove the workflow on real work — not a demo.

  3. 03

    Go live on the floor, then decide

    Your team runs it with training and support. You expand to the rest of the floor only once the first result is on the table — live in weeks, and yours to own.

One workflow · live in weeks · expand only after it works · you own it outright

Section 07 · The engagement

Two steps. Fixed scope. The analysis comes off the build.

No open-ended day rates, no "we'll scope it later." You get an exact, fixed build number before anything is built — and the Gap Analysis fee is credited in full against it.

A mid-market ERP runs £100k+ and a year to roll out — for shop-floor job tracking you'd use a fraction of. This is fixed-scope, live in weeks, and yours to own.

Step 1 · the estimate

Operations Gap Analysis

£1,000–£3,000
  • We map your floor and the real cost of the slip
  • The one workflow to fix first
  • A fixed-scope plan with the exact build price

↳ Credited in full off the build if you proceed.

Step 2 · the build

A production system, sized to your floor

Starter Fix£3k–£10kA live job board with every job's stage in one place.
Growth System£10k–£25kLive job tracking, shop-floor scheduling and delay alerts.
Operations Platform£25k+A connected system across jobs, materials and dispatch.

One number, agreed before we build · live in weeks · you own it · delivery guaranteed in writing.

Book the Operations Leak Audit Free Fit-Check first · no clients under £3k
Section 08 · The guarantee

Delivery guaranteed. In writing.

We guarantee delivery of what's scoped — not a results promise, a delivery one, on paper. You see the exact figure and everything that gets built before you pay to build a thing.

Scoped before you commitThe exact number and everything built lands in your plan — before you pay to build anything.
You own it outrightNo per-seat fees, no licence to renew, no vendor sunset. It's yours to keep and change.
Built & backed by the founderYou talk to the person who builds it — not a reseller, a support queue or a sales rep.
Section 09 · Fit before pitch

Built for a specific kind of floor. Not everyone.

A strong fit when you…

  • Run a UK manufacturer, job shop or fabrication business.
  • Take custom or make-to-order work with real due dates.
  • Track jobs on a whiteboard, spreadsheets or in someone's head.
  • Lose time to floor walks and "where's that job?".
  • Can point to one workflow that keeps jobs slipping.

Probably not when you…

  • Need a cheap off-the-shelf app at the lowest price.
  • Run pure high-volume repetitive lines with no job variation.
  • Can't give floor-owner access or realistic job data.
  • Want an immediate full global ERP replacement.
Section 10 · Straight answers

What cautious production managers usually ask.

Will the lads on the floor actually use it?
It's built around how they already work — big tap-and-scan targets at the machine, one job booked on or off in a second, no forms to fill. There's nothing new to learn; they update a job the way they already move it, and the board updates itself instead of waiting on someone to remember.
Why pay for the Gap Analysis first?
Because guessing the scope is how projects blow up. The Gap Analysis maps your floor, finds the one workflow costing you the most, and produces a fixed build price and plan — before you commit to building anything. And it's credited in full off the build if you proceed, so if you go ahead it effectively costs nothing.
How is this not going to cost 10× like an ERP?
An ERP charges per seat forever and quotes one price, then bills another once it's rolled out. Here the build is one fixed number, agreed before any work starts, and you own it outright — no per-seat fees, no licence to renew, no surprise once the whole floor is on it.
Do we have to replace our job sheets or accounting tools?
No. We connect to the routing and tools you already rely on and build around them, so production data flows in instead of being re-keyed — and we replace only the part that's actually slipping.
What if it doesn't deliver?
Delivery is guaranteed in writing. It's a delivery guarantee, not a results promise — we put what's scoped on paper, and you see the exact figure and everything that gets built before you pay to build a thing.
How quickly can we be live?
Live in weeks, not a year. After a free Fit-Check and the Gap Analysis confirm the scope, the first workflow is built, proven on real jobs and taken live — then you decide whether to expand to the rest of the floor.
Section 11 · One clear next step

Show us where jobs slip. We'll show you the first fix.

Two minutes to map how your floor actually runs — and exactly what one system would fix first. It's free, and there's no commitment to build.

  • 01Pin down the job that slips most
  • 02See the cost it's leaking, in £
  • 03Get an honest fit recommendation
Book the auditStep 1 / 3